6686体育APP

English

Hubei Shiyan God set River Sewage Treatment Plant

厂辞耻谤肠别:颁颁颁颁罢颈尘别:2021-09-01

The total scale of this project is 180,000 m3/d, of which the MBR process is 140,000 m3/d. The main index of effluent water quality is better than the national first-class A discharge standard. Thi...

The total scale of this project is 180,000 m3/d, of which the MBR process is 140,000 m3/d. The main index of effluent water quality is better than the national first-class A discharge standard. This project plays A positive role in protecting the water quality of Danjiangkou Reservoir, the water source of the South-to-North Water Transfer Project. 
 

Editor: CCCC